Construction is underway at 2293 Verus Street. The mezzanine steel is up, dust collection is roughed into the wood and metal shops, and three-phase power is being pulled to the machine bays.
Downstairs, the four shops are being framed out — wood, metal and welding, digital fab, and electronics. Upstairs is coming together as desks, a lounge, and the gym; the yard out back is next.
The first machines are on order. More build updates as the walls go up — follow along on the workspace and shops pages.
← Back to news